Columbia ST

DJ's Electrical was in need of a foundation for their high line tower structure. The pressure drill had no problem performing a 7’ round 27’ deep hole for their foundation.

Drilling Services
High Line Towers

General Contractor:

DJ's Electrical

Location:

Vancouver Washington

Completed:

2019

Bring out the big drill.